Our typical solutions include the following: Customize Nursing Homes For The Elderly in The Customer's Community, Customize the command post for the construction site, Customized container family home, etc. Now I will introduce the command post of the customized construction site. You can check our case
Prefab container house project
Provide a set of efficient, durable and quickly deployable temporary command center for the construction site to meet the needs of project management, meetings, monitoring and personnel office. It adopts modular container buildings, integrates office, meeting, monitoring, rest and other functions to ensure efficient and orderly site management. Independent workstations, filing cabinets, printers and other office equipment, tea rooms, simple sofas/folding beds (for shift workers), storage of network servers, monitoring hosts, backup power supplies, etc. Building characteristics: wind and earthquake resistance, suitable for harsh outdoor conditions, insulation layer + anti-rust coating, adapt to high temperature, rain, dust environment, double-layer glass windows + sealing strips to reduce sand and dust entry, can be hoisted and transported as a whole, and adjust the position as the project progresses.
Service process:
Phase 1: Demand research and solution design: understand the scale of the construction site, the number of personnel, functional requirements (such as whether a monitoring room, independent office, etc. are needed), provide layout plans (single box or multi-box combination) and 3D renderings, and enter production after confirmation.
Phase 2: Factory prefabrication: container reinforcement, thermal insulation and sound insulation, internal water and electricity wiring, installation of doors, windows, floors, lighting, air conditioning reserved openings and other infrastructure.
Phase 3: Transportation and on-site installation: transport the entire container to the construction site, hoist it in place (completed within 1 day), connect external water and electricity, install equipment (monitoring screens, office furniture, etc.)
Phase 4: Debugging and delivery: test power, network, and monitoring systems to ensure normal operation, provide training and maintenance manuals